Detail NR1 ELEC/INST RM/KL/CM
2024-02-13
ER-3-JUMPERED-ACB-AND-VCB
Wahyu Adi Triono
Problem: Jumpered ACB and VCB are not do at ER3
Action:
Prepare cable for jumpered ACB and VCB, connect from power input to panel ACB and VCB ( EMIS-RIZAL-AGUS-PENY-YOGA-ADI-ANDRI-DEDI-SUPRI-ATIP-OHA)

Status: done
Back to report list