Detail NR1 ELEC/INST RM/KL/CM
2024-05-06
SLIDE-GATE-CKD
Wahyu Adi Triono
Problem: Pulling cable 4 limit switch dan 2 solenoid valve
Action:
Take cable indication and power for limit switch and solenoid valve at ware house electric around green cable 35 meter and black cable 100 meter. Pulling cable from site slide gate CKD to panel i/O at 363 FN2. Prepare box termination cable at work shop ( RIZAL & ADI & ANDRI )

Status: done
Back to report list