Detail NR1 ELEC/INST RM/KL/CM
2024-07-19
443-PH1
Wahyu Adi Triono
Problem: WBI electrical and instrumentation top blending, GCT, CT, pre heater, kiln, burner floor
Action:
WBI electrical and instrumentation area top blending, pre heater, GCT, CT, kiln and burner floor. Measure vibration, noise and temperature free and load side motor. Check auto grease tank, some motor at low level need to be refill auto grease tank ( ADI & EVE RIZKY )

Status: done
Back to report list