Detail NR1 ELEC/INST RM/KL/CM
2024-07-19
WARE-HOUSE
Wahyu Adi Triono
Problem: Install panel lighting for heater power
Action:
Fabrication support panel at work shop. Install panel lighting at ware house ( ANDRI )

Status: done
Back to report list