Detail NR1 ELEC/INST RM/KL/CM
2024-12-20
HRG
Wahyu Adi Triono
Problem: Observation level RO and leaked piping of HRG or WTP and solenoid
Action:
Repare leaked piping HRG, add seal tape at pipe and solenoid valve test leaked ok ( JAJAT & FIRMAN & AIMAN )

Status: done
Back to report list