Detail NR1 ELEC/INST RM/KL/CM
2025-01-06
443-EL1
Wahyu Adi Triono
Problem: Prepare elevator connection cable power
Action:
Prepare cable power of elevator and connection cable at ER4 also 8th floor. Install cable tray at 8th floor continue connect cable at LCS  also install cable duct cable at 8th floor. Connect cable of elevator at ER4 ( AGUS & FIRMAN & ADI & EVE RAMADHAN )

Status: done
Back to report list