Detail NR1 ELEC/INST RM/KL/CM
2025-01-08
L63-CM1
Wahyu Adi Triono
Problem: WBI electrical and instrumentation check I/O area CM, SUMP PUMP T&T
Action:
WBI electrical and instrumentation check I/O area CM, SUMP PUMP T&T. Measure vibration, noise, temperature free and load side motor. Make note at file for un normal vibration and noise free and load side motor ( MUHAIMIN & ADI & EVE RAMADHAN )

Status: done
Back to report list