Detail NR1 ELEC/INST RM/KL/CM
2025-02-06
363-PU1
Wahyu Adi Triono
Problem: Fabrication panel and control. Install module CCR and pulling cable MCC
Action:
Pulling Back /Pulling new kabel power kontrol dan kontrol  to  IO N-31-4 , Modul  control DCS sudah dibuat, Addresing done ( AGUS & FIRMAN & AIMAN & EVE PUTRI & EVE FARHANSYAH & JAJAT )

Status: done