Detail NR1 ELEC/INST RM/KL/CM
2025-05-14
L63-SR1.P2
Wahyu Adi Triono
Problem: Issue indication pressure low at CCR, Relocation pressure Transmiter (Replace Pressure Transmiter)
Action:
Replace pressure transmitter and relocation pressure transmitter result indication pressure normal at CCR  ( RIZAL & ANDRI & EVE ANDRE )

Status: done
Back to report list