Detail NR1 ELEC/INST RM/KL/CM
2025-06-05
483-FA2
Wahyu Adi Triono
Problem: Prepare instalation Drive 483-FA2 + Prepare Drawing Diagram + IO needed
Action:
Prepare drawing diagram and IO needed also instalation drive 483 FA2 ( AGUS & FIRMAN & MUHAIMIN & EVE IQBAL )

Status: done
Back to report list