Detail NR1 ELEC/INST RM/KL/CM
2026-03-31
WORK-SHOP
Wahyu Adi Triono
Problem: Prepare and fabrication control FABA ( info control at Mr.Yunus )
Action:
Take control at Mr.Yunus bring to workshop. Prepare control FABA at workshop ( AGUS & MUHAIMIN )

Status: done
Back to report list