Detail NR1 ELEC/INST RM/KL/CM
2026-09-24
443-EL1
Wahyu Adi Triono
Problem: Prepare Replacement cable
Action:
Pulling cable power and relocation conduit from main hole to protect from positive hot gas. Also install LCS at north side from existing south side ( JAJAT & AGUS & EDI & ADI & ANDRI & ANDRI & DADANG & DAFI TRUBA )

Status: done
Back to report list